学坛作文网

Office decoration agreement

2022-03-31 03:41:02 5

The office decoration is also an agreement. Below is a small series of office installation agreement, welcome to reference!

Happian (Party A): _________________

Contractor (Party B): _________________

In accordance with the principle of "People's Republic of China Contract Law", "People's Republic of China Architecture Law" and other relevant laws, administrative regulations, compliance, voluntary, equitable, and honesty, both parties have consistent with the construction of this construction project, and formulate this contract.

Article 1: Project overview

1. Project Name: Office Decoration

2. Project location: _________________________

3. Work range: Interior decoration (see budget list)

4. Project contract: This project uses a semi-packaged approach method (see attachment list)

5, engineering cost

(1) The project budget is equipped with ¥ ____________ yuan, capitalization Renminbi: ________________ yuan.

(2) Calculation of the total cost price of this project

A, based on engineering design, construction drawings and design changes, on-site visas.

B, construction disorder arising from the construction disorder in the construction of the construction obstacles and other costs.

C. The new project costs are required in the construction.

Article 2 Project

1, Ethers, B and Party B determined: the contractual period of this project is ____ 天 (calendar), the specific development time is subject to the start-up report signed by both Party].

2, the scheduled start date is ____ year ____ month ____ day, the scheduled completion date is ____ year ____ month ____ day.

3. This project is in the process of construction, in the case of the following cases, can be in the process period.

(1) Due to force majeure, it cannot be normal construction;

(2) Since Party A causes continuous construction (including the project payment is not in place).

(3) Due to design changes or designation undefined.

(4) Since the relevant property or administrative approval procedures are not completed.

(5) Due to the construction site (non-Party B), the parking abortion is more than 8 hours;

(6) Since Party A is not possible in time to support or match the unit, it cannot be used to work.

Article 3 Project Construction Preparation and Both Party Responsibility

1, Party A Responsibility

(1) Before the start of the first parties, the procedures of all aspects are started, and Party A shall bear the fee.

(2) Organize the design and drawing of the drawings.

(3) Entrusted to Party A representative, implement engineering quality, progress supervision, representing the daily matters of Party A treatment project.

(4) 1 day before starting, Party A Surven decoration site for engineering.

(5) Do Party A provides supplies materials and equipment; implementing construction funds, paying the project prepayment, and performs on-site visas, completion acceptance.

2, Party B Responsibility

(1) Provide complete construction drawings and construction technical information.

(2) Precautions, relevant personnel, are familiar with construction drawings and design materials, prepare construction plan budgets and construction organization plans, and formulate the progress of the construction plan.

(3) Do the construction preparation work, organize the entrance, procurement, supply and management of good personnel and material facilities.

(4) Strictly constructed construction drawings and instructions to ensure the quality of the project, and the time regulations shall be completed and delivered as scheduled, and the relevant provisions of the relevant maintenance agreements agreed by both parties. The repair of artificial damage is the responsibility of the responsibility and takes charge.

(5) Entrusted to Party B, representing Party B and Party B and Party A representative personnel.

Article 4 Engineering Price and Payment

1. The project contract budget is based on the worklo建筑图纸和施工方案。

2.管理合作,装饰存款等应由该物业收取的管理团队缔约方支付。

3,这个项目的总价格为¥:___________袁。

4.付款根据项目进度采取付款方式。

5.时间和相应的分割金额是:

(1)合同标牌支付合约价格为10%,¥:___________人民币。

(2)项目完成后,将支付项目尾部:____________元。

项目更改项目付款由双方确认,并增加了项目。

第五条施工质量和设计变化

1

(1)发现设计是错误的或严重的不合理。乙方后,乙方应在三天内同意设计单位,发出设计文件,A和B两份签署协议的变化。建造。

(2)在设计超出原始设计标准或尺寸之外的变化时,必须根据批准程序重新承认批准,A和B双方。

(3)如果不可能支付甲方的投资不可能支付项目时间表,则造成了一个中途停止建设,混合,双方应同意建设项目的建设,并通过乙方的经济损失。

2.如果乙方遇到重要且复杂的隐藏项目内容,党A可以通知派对A接受普通接受,如派对A没有参加时间,乙方可以检查接受接受,党A应该承认。

第6条项目完成接受和结算

1.乙方在项目完成之前被写入或口头通知。

2.甲方应当接受接受接受后通知接受和发行项目接受的接受。

3,该项目没有经验丰富,甲方提前应被视为一方确认项目,如果在使用后发现质量问题,党A负责。

4.项目完成后,乙方提供了一年的免费维修服务,但不含人造成的损坏部件。

第7条项目安全生产,文明建设

1.甲方应做好安全,清晰的安全要求和监督和检查,双方应咨询有关安全生产责任和安全消防。

2,乙方必须认真实施安全生产,文明建设,做好安全生产,文明建设教育,严格的安全运行程序,文明建设要求,严格执行公安消防规定。

3.在施工期间,党的B工人有忧虑和紧急情况,党内提供便利,协助救援义务,责任和成本受到负责任的负担。

第8条工程养老金和仲裁

1.根据该项目合同的年份,罚款应根据项目的总成本惩罚,工作期限应予以惩罚。如果违约是合同,则合同价格的30%是合同价格的。

2,缔约方延迟结算和付款,并根据现行有关规定的陈述实施。

3,合同纠纷在实施过程中,各方应及时谈判,协调和在任何一方,缔约方适用于主管当局或建筑机关的主管部门调解,调解可能会出院从项目被解雇给仲裁委员会的仲裁委员会。项目所在的人民法院。

第9条

1,本合同并非没关系,双方迅速查阅条款,补充规定是同样的法律效应。

2,本合同是一个,而双方则活着。

3,本合同已在签署方后生效,该项目已完成,保修期满,工程价格将自动终止。

4.本合同的有效依附。

(1)乙方提供平面图;

(2)项目预算;

(3)补充规定;

(4)其他

派对A(邮票):乙方(邮票):

代理人:代理人:

年,月,一个月

同类文章

社区学雷锋志愿服务活动总结2021

  深入挖掘雷锋精神的时代内涵,倡导青年志愿者做到时时学、处处学。今天,小编要跟大家分享的是社区学雷锋志愿服务活动总结,感谢您的阅读!志愿服务活动总结【一】  雷锋精神是我们中华民族宝贵的精神财富

2021二年级学生评语集

  期末评语就是把学生在一定时期内的操行表现,用准确、客观、公正的语言进行表述的创作过程。那么你知道20xx二年级学生评语怎么写吗?接下来第一范文网小编和你一起分享20xx二年级学生评语

大学新生军训班主任祝福寄语

  【篇一】  1、一身的迷彩服,让每一位同学都多了一份英姿,多了一份责任。  2、磨练顽强的斗志,培养吃苦的精神,锤炼良好的品质。  3、做事不怕难,自无难人事。天下无难事,只怕有心人

2021党员学习情况汇报参考范文

  党性是我们党区别于其他政党的鲜明标志,党员参加了党课学习后要向党组织做学习情况汇报。以下第一范文网小编为你带来20xx党员个人学习情况汇报工作范文,希望对你有所帮助

2020年3月入党积极分子的思想汇报

  尊敬的党组织:  2019多年前,勤劳勇敢的中国人民用智慧、勇气和汗水开拓了连接亚欧非大陆各文明的人文、贸易交流通路,与沿线各国人民共同铸就了辉煌的古丝绸之路。千百年来

党员转正的一年社会工作总结

  党员是党的行为主体,党的先进性最终要体现在党员身上。今天第一范文网小编给大家为您整理了党员转正的一年社会工作总结,希望对大家有所帮助

2020中考誓师大会精选发言稿

  圣人与常人之间往往只相差一小步,而这一小步却往往需要非凡的毅力才能赶上。那么,今天小编为大家带来的是关于中考誓师大会发言稿的范文,希望对大家有所帮助!如果你喜欢记得分享给身边的朋友哦

聘任书范文

  聘请书范本  企业名称_______________________ 接洽人_________________________       _________年___月___日 1

商场营业员心得体会

  商场服务员是商场的面向顾客的第一人,服务员的良好绩效能够促进整体效益的实现,下面是小编精心整理的商场服务员培训心得体会,欢迎大家学习和参阅。  商场营业员心得体会  销售是一门艺术

入团时间什么时候

  入团可以帮助我们更好的成长,给予青年人更好的指导,入团是先进的青年的追求,入团一般在什么时间呢?下面是小编为大家收集整理的AAAAA,欢迎大家阅读